The brick at Southwest Clay Street was paved over decades ago in Topeka’s historic neighborhood. PEC worked with the City and contractor to resurrect the rustic aesthetic of the street using the original brick while solving drainage problems, preserving mature trees, meeting ADA standards and reducing life cycle maintenance costs with minimal disruption to the neighborhood.
Completion Date: 2016
Construction Cost: $1,400,000.00
Services:
Construction Administration
Construction Observation
Historical Preservation
Inspection
Materials Testing
Municipal Engineering
Site Civil Engineering
Stormwater Management
Street Design
Survey Engineering
Transportation Engineering