K-96 & Greenwich Interchange

PEC's capabilities include Transportation State and Federal featured Project

Wichita, KS

As with any project, the design and planning of the K-96 and Greenwich Road east 1/2 folder diamond interchange on a 4-lane freeway were critical for smooth construction. Clear communication between PEC, City of Wichita staff, and the individual utility companies was paramount. When undertaking road widening and ramp additions, many underlying utility issues must be considered. PEC’s entire team worked one-on-one to assure all utility needs were met during the design process and major delays were eliminated during construction.

Construction Completion Date: 2016

Construction Cost: $86,000,000.00

Services:

Bridge Design

Drainage Study

Geotechnical Engineering

Grading Design

Intersection Design

Paving Design

Survey Engineering

Traffic Engineering

Traffic Signalization

Transportation Engineering