Plan Room

Welcome to Our Plan Room

Posted: Status: Post Bid Addendum Posted:

35-197032-002-0951 – Wastewater Collection System and Treatment Facility Improvements – Garden City, Kansas

Contact Person:

Amelia Jordan, P.E.

Bid Date & Time:

May 13, 2020 2:00 pm

Owner:

City of Garden City

Project Location:

Garden City, Kansas

Project Description:

ADDENDUM NO. 1 POSTED: MAY 11, 2020

Improvements at the wastewater treatment plant including blasting/coating of various equipment and appurtenances, concrete repairs, electrical repairs, new standby natural gas powered generator, and replacement of four (4) shaft turbine mixers; collection system improvements including replacement of control panels at three (3) lift stations and installation of new natural gas powered generator at one (1) lift station.

CONTRACT DOCUMENTS/PLANS CAN BE EXAMINED AT:

  1. City of Garden City, 301 North 8th, Garden City, Kansas 67846
  2. Professional Engineering Consultants, P.A., 303 S. Topeka, Wichita, Kansas 67202
  3. KCNR, LLC., 230 S. Laura, Suite 101, Wichita, Kansas 67211

PEO 11246:

Bidders on the work will be required to comply with the President’s Executive Order No. 11246. Requirements for bidders and contractors under this order are explained in the specifications.

Kansas Age Discrimination:

Bidders on this work, including subcontractors or vendors, will be required to comply with the Kansas Act Against Discrimination (K.S.A. 44-1001 et. seq.) and the Kansas Age Discrimination in Employment Act (K.S.A. 44-1111 et. seq.).